Saturday, September 25, 2010

FINAL SCRIPT

With school back in that mean the fall play will start soon. We stopped in the PAC to see how the show is coming.

(NO NATURAL SOUND)

ROB RACHOW (DIRECTOR/TECH DIRECTOR)-
1) What are you doing to prepare for this show?
For this show I have read the scrip many times more than any other show, I have watched the movie, watch the DVD of the last time we did this show. Tech wise we have had a good tech turn out so the set is close to being done and this set is hard because it is a 2 story house on a lazy Suzan.

Becouse this set is so big the tech crew has been working extra hard.

(NATURAL SOUND AT LOW VALUME TO SLIGHTLY HEAR THE TECH CREW WORKING)

VICKI LUSE (TECHIE)-
1) What is you favorite part of the show process?
My favorite part of each show is kind of tied between building and the finished show. The building process is a lot of work but it’s really fun to see the set grow until it’s really cool. Once it’s done it feels good to see all the hard work you’ve done turn into something that other people can enjoy.

(INTERVIEW IN FRONT OF REHERSOL WITH LOW SOUND OF THE ACTORS PRACTICING)

LEAH RIDDLE (ACTOR)-
2) What is your favorite part of the show?
My favorite part of the show would have to be the second act because we turn the set around and then the audience can see all the drama going on back stage.

 (CLOSE WITH A SHOT OF THE ACTORS PERFORMING AND THAN HAVE SOMEBODY SAY THE DATE AND TIME OF SHOWS)

No comments:

Post a Comment